Manufacturing ERP for ISO-Certified Steel Production

Production managers now track 336 MT of daily output in real time. ISO audit preparation went from weeks to hours with automated quality documentation. Raw material waste decreased significantly through better consumption tracking, and the system is ready to scale for planned I-beam and H-beam product lines.

Maisam Steel Mill
2025
7 months
Daily Output Tracked
ISO Compliance
Product Lines
Employees
01

Problem

Maisam Steel Mill, Afghanistan's first IEC/ISO 9001:2015 and IEC/ISO 45001:2018 certified steel manufacturer, produces up to 336 metric tons daily — including rebar, angles, and T-bars. With over 200 employees and plans to expand into I-beams and H-beams, their manual production tracking and paper-based quality management couldn't maintain ISO compliance at scale or provide the operational visibility needed for growth.

02

Approach

We analyzed MSM's production floor operations, quality control checkpoints, raw material procurement, and ISO compliance documentation requirements. The solution was designed to integrate manufacturing execution with financial controls and quality management.

03

Solution

Deployed Odoo Manufacturing, Inventory, Purchase, Accounting, and Quality modules. Built custom work order flows for rebar, angle, and T-bar production lines, integrated raw material consumption tracking, automated ISO quality checkpoints, and connected everything to real-time production dashboards showing output, waste, and efficiency metrics.

04

Outcome

Production managers now track 336 MT of daily output in real time. ISO audit preparation went from weeks to hours with automated quality documentation. Raw material waste decreased significantly through better consumption tracking, and the system is ready to scale for planned I-beam and H-beam product lines.

Maintaining ISO certification while scaling production was our biggest challenge. Orhan built a system that automates our quality processes and gives us complete production visibility.

O

Operations Manager

Maisam Steel Mill

Process

Project Timeline

1

Production Floor Analysis

4 weeks

Mapping work orders, quality checkpoints, and material flows across all product lines

2

System Design

5 weeks

Manufacturing workflows, BOM structures, and ISO quality integration

3

Implementation

14 weeks

Module deployment, production data migration, and floor integration

4

Training & Certification Prep

5 weeks

Operator training, ISO documentation automation, and go-live